spc
logot

WINNER II - Public Deliverables


Public Deliverables produced within WINNER II (January 2006 - December 2007). Delivery month refers to the start of the project in January 2006.

The nature of the deliverable is described using one of the following codes:

R = Report
D = Demonstrator

The dissemination level is described using one of the following codes:
PU = Public
RE = Restricted to a group specified by the consortium (including the Commission Services)

 

 Del. Deliverable
Title

Dissemination
level
Nature

Delivery
Month
D1.1.1 WINNER II interim channel models
PU R 11
D1.1.2 WINNER II channel models
PU R 21
D2.2.3 Modulation and Coding schemes for the WINNER II System
PU R 23
D2.3.3 Link level procedures for the WINNER II System
PU R 23
D3.4.1 The WINNER II Air Interface: Refined Spatial-Temporal Processing Solutions
PU R 11
D3.5.1 Relaying concepts and supporting actions in the context of CGs
PU R 10
D3.5.2 Assessment of relay based deployment concepts and detailed description of related multi-hop capable RAN protocols as input for the CG work
PU R 18
D3.5.3 Final assessment of relaying concepts for all CGs scenarios under consideration of related WINNER II L1 and L2 protocol functions
PU R 21
D4.6.1 The WINNER II Air Interface: Refined multiple access concepts
PU R 11
D4.7.1 Interference averaging concepts
PU R 18
D4.7.2 Interference avoidance concepts
PU R 18
D4.7.3 Smart antenna based interference mitigation
PU R 18
D4.8.1 WINNER II intramode and intermode cooperation schemes definition
PU R 06
D4.8.2 Cooperation schemes validation
PU R 18
D4.8.3 Integration of cooperation on WINNER II System Concept
PU R 23
D5.10.1 Detailed WINNER II spectrum requirements
PU R 23
D5.10.2 Spectrum requirements for systems beyond IMT-2000
PU R 14
D5.10.3 WINNER II spectrum sharing study
PU R 11
D6.11.1 Revised WINNER II System Requirements PU R 06
D6.11.2 Key Scenarios and Implications for WINNER II
PU R 09
D6.11.3 Scenarios for evolution to WINNER II
PU R 23
D6.11.4 Final WINNER II System Requirements
PU R 18
D6.12.1 Detailed WINNER II system trial plan for Phase III trials
PU R 23
D6.12.2 Report on validation and implementation of WINNER physical layer
PU R 23
D6.12.3 Report on validation and implementation of key WINNER co-operation functionalities
PU R 23
D6.12.4 Limited proof-of-concept of WINNER physical layer with live multimedia application
RE + PU D + R 23
D6.12.5 Limited proof-of-concept of WINNER co-operation architecture
RE + PU D + R 23
D6.13.1 WINNER II Test scenarios and calibration cases issue 1
PU R 06
D6.13.2 State-of-the-art evaluation issue 1
PU R 06
D6.13.7 WINNER II Test scenarios and calibration cases issue 2
PU R 11
D6.13.9 State-of-the-art evaluation issue 2
PU R 18
D6.13.10 Final CG “wide area” description for integration into overall System Concept and assessment of key technologies
PU R 22
D6.13.11 Final CG “metropolitan area” description for integration into overall System Concept and assessment of key technologies
PU R 22
D6.13.12 Final CG “local area” description for integration into overall System Concept and assessment of key technologies
PU R 22
D6.13.14 WINNER II System Concept Design
PU R 23
D7.1.1 Project website
PU O 01
D7.1.2 Final plan for using and disseminating knowledge
PU R 04
D7.1.3 Report on raising public participation and awareness
PU R 23
D7.1.4 Report on gender action plan
PU R 23
D7.1.5 Final Report
PU R 24
D7.1.6 Final Plan for using and disseminating knowledge PU R 24

 

<< [ back ]